Default Tarion Process at the PDI

There are a number of items that must be checked at the pdi stage so that it is 100% certain it was caused by builders subcontractors (not the home owner).

Quote:
Originally Posted by ildara View Post

Edit/Update:
While skimming through the guidelines I noticed that some sections specifically mentioned the PDI Form. I copied and pasted the section names and remarks in a Google doc, and they are also listed below with links to Tarion.

3. WALL FRAMING
6. PLUMBING
7. ELECTRICAL
8. INTERIOR CLIMATE CONTROL
9. WALL AND CEILING FINISH
10. INTERIOR FINISH
11. CABINETS AND COUNTERTOPS
12. FLOORING
14. GARAGES AND EXTERIORS