Default Tarion Appeal Process 2nd Year

Has anyone in this forum had any sucess appealing the items on their 2nd year decision letter from Tarion's 2nd year concilation inspection? Thanks.
Rafa
Reply With Quote
  #2  
Old 2015-01-28, 06:13 PM
good2know's Avatar
good2know good2know is offline
Senior Member
Regular User
 
Join Date: Sep 2010
Location: Ottawa
Posts: 5,775
Default

The conciliation and appeal process is the same at all stages. Can you provide some specifics on the issues?
Reply With Quote
  #3  
Old 2015-02-03, 07:25 AM
Halton Home Inspector Halton Home Inspector is offline
Senior Member
Regular User
 
Join Date: Dec 2008
Location: Milton
Posts: 681
Default

Just so people know - Unlike the 30 day and One Year submissions where you can only submit one list at very specific times, the Two Year submission process is different.

1 - During the second year you can submit as many lists as you like at any time and as often as neaded. So,,, provided the issue is legitimate there is no reason for you to wait until the end of the second year.

2 - Second year issues that are covered include:

A - Water penetration through the basement or foundation walls.

B - Defects in materials, including windows, doors and caulking, or defects in work that result in water penetration into the building envelope.

C - Defects in work and materials in the electrical, plumbing and heating delivery and distribution systems.

D - Defects in work or materials which result in the detachment, displacement or deterioration of exterior cladding (such as brickwork, aluminum or vinyl siding).

E - Violations of the Ontario Building Code affecting health and safety including, but not limited to, violations relating to fire safety, garage gas-proofing problems, missing or loose guardrails, attic party wall problems between townhomes, etc.

F - ​Major structural defects.
__________________
For the new home warranty inspection services you need and deserve call Andy Shaw at 905 876 4761
Reply With Quote
Reply

Bookmarks

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump

Similar Threads
Thread Thread Starter Forum Replies Last Post
Tarion Process at the PDI good2know Tarion Questions 14 2019-06-19 08:19 AM
Tarion Process Overview good2know Tarion Questions 1 2014-11-20 10:31 PM
Tarion 2 year Cosmogrrl Ottawa 3 2013-02-22 02:22 PM
First Year report to Tarion M&H Ottawa 5 2009-12-07 10:51 AM
2nd year tarion forms? the thompsons Stouffville - Mattamy On Main and Wheler’S Mill 6 2009-01-24 03:44 AM



All times are GMT -4. The time now is 06:49 AM.



Copyright © PHAND Corporation
This document may not be used elsewhere without the expressed written consent of PHAND Corporation.
*** There is no association between this website and any builder. ***

Powered by vBulletin® Version 3.8.10
Copyright ©2000 - 2019, vBulletin Solutions, Inc.