Ya, they won't dig or pour concrete when the weather is close to freezing, it affects the foundation. But I did notice that the gas lines were going in, was nice to be able to view the progress. Quite excited for 2014!

Stuffy, which Smartcentres were you talking about? I work in the one in Alliston and they have basically stopped building for now and will build to suit, but the original plan has been put on hold, mostly due to uncertain surrounding the recession of 2008-2009 as the plans were done before then.
Reply With Quote
  #22  
Old 2013-11-03, 11:40 PM
stuffy stuffy is offline
Member
Regular User
 
Join Date: Aug 2013
Location: Cookstown
Posts: 90
Default

Quote:
Originally Posted by rw13 View Post
Ya, they won't dig or pour concrete when the weather is close to freezing, it affects the foundation. But I did notice that the gas lines were going in, was nice to be able to view the progress. Quite excited for 2014!

Stuffy, which Smartcentres were you talking about? I work in the one in Alliston and they have basically stopped building for now and will build to suit, but the original plan has been put on hold, mostly due to uncertain surrounding the recession of 2008-2009 as the plans were done before then.
Oh when I was driving by a couple of weeks ago I saw the Smartcentre sign just up the road from Cookstown. I then went online and read this:

http://www.thebarrieexaminer.com/201...-40-room-hotel

So you are saying it wont be built anytime soon then? I guess Alliston will be the shopping place for me then
Reply With Quote
  #23  
Old 2013-11-05, 10:42 AM
winston88 winston88 is offline
Junior Member
 
Join Date: Nov 2013
Location: Cookstown
Posts: 8
Default

I haven't been out there in a while.

Have the lots been marked? I am interetsed to see the size and layout.

Do we know what the street names are going to be?
Reply With Quote
  #24  
Old 2013-11-05, 09:30 PM
rw13 rw13 is offline
Member
Regular User
 
Join Date: Sep 2013
Location: Cookstown
Posts: 50
Default

Hi Winston

The lots are marked. No street names at all. The big thing I noticed was the grade of the land. The land slopes from north to south and there is a decent drop off. I'm actually hoping for a possible walk out instead of a lookout basement based on the lay of my current lot.

@ Stuffy, I'm not sure about the smart centre on 5th side road and innisfil beach road, but the one in alliston is on hold. Either way, living in Cookstown allows us to go to either Alliston (10 mins), Barrie (18 mins) or Bradford (15mins), so its all good!

Welcome winston!
rw
Reply With Quote
  #25  
Old 2013-11-12, 11:32 PM
stuffy stuffy is offline
Member
Regular User
 
Join Date: Aug 2013
Location: Cookstown
Posts: 90
Default

Quote:
Originally Posted by rw13 View Post
Hi Winston



@ Stuffy, I'm not sure about the smart centre on 5th side road and innisfil beach road, but the one in alliston is on hold. Either way, living in Cookstown allows us to go to either Alliston (10 mins), Barrie (18 mins) or Bradford (15mins), so its all good!


rw
Yes that is true . I was just curious if the project will still be built as planned..for now we will just have to wait and see I guess.
Reply With Quote
  #26  
Old 2013-11-18, 11:43 AM
winston88 winston88 is offline
Junior Member
 
Join Date: Nov 2013
Location: Cookstown
Posts: 8
Default

Has anyone been out the site recently? Just wondering if there has been any progress or if everything is on hold until the spring?
Reply With Quote
  #27  
Old 2013-11-18, 09:25 PM
rw13 rw13 is offline
Member
Regular User
 
Join Date: Sep 2013
Location: Cookstown
Posts: 50
Default

Hi Winston

I drove by yesterday and there is quite a bunch of construction going on. They have just put in those green boxes, I believe they use for cable and internet. The gas lines have been buried, the electrical lines are going in and the water valves have been placed in the lots. So lots going on there, but I don't believe any foundations will be poured until spring.

We close Aug 2014, but are resigned to at the very least, Christmas time.

Cheers
RW
Reply With Quote
  #28  
Old 2013-11-19, 02:26 PM
stuffy stuffy is offline
Member
Regular User
 
Join Date: Aug 2013
Location: Cookstown
Posts: 90
Default

That is good news RW....I was thinking they would do nothing more until next year...

Is it possible for someone to take a picture of the site? I rarely go out there as I am currently an hour away, and am curious what everything looks like now .
Reply With Quote
  #29  
Old 2013-11-25, 12:59 PM
stuffy stuffy is offline
Member
Regular User
 
Join Date: Aug 2013
Location: Cookstown
Posts: 90
Default

Any more progress at the site? The weather has turned worse, so I am guessing no more construction until the new year.....
Reply With Quote
  #30  
Old 2013-11-30, 10:43 PM
stuffy stuffy is offline
Member
Regular User
 
Join Date: Aug 2013
Location: Cookstown
Posts: 90
Default

Hi Rw. I was just wondering did anyone mention which lots were lookouts and walkouts? Just wondering how high/low the backyard will be...
Reply With Quote
Reply

Bookmarks

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump

Similar Threads
Thread Thread Starter Forum Replies Last Post
Innisfil - Country Homes - Alcona by the Lake me2kuna Simcoe 41 2015-02-02 06:27 PM
NORTH STAR - Valley Green stekat Milton 1108 2014-04-06 06:52 PM
Maple Lane Homes- Innisfil LJB Simcoe 64 2013-11-30 02:53 PM
North Star Homes - King's Crossing Phase I Normand Richmond Hill 49 2012-10-16 12:03 PM
North Star Homes Teeta Brampton 3 2010-03-17 10:03 AM



All times are GMT -4. The time now is 09:04 PM.



Copyright © PHAND Corporation
This document may not be used elsewhere without the expressed written consent of PHAND Corporation.