And they have not even started to drywall yet!!! My type "A" personality is starting to cause me to not sleep at night!!! Someone...please reassure me that Sundial can do the entire interior of my home in 21 days!!!!
__________________



Reply With Quote
  #2  
Old 2007-02-09, 11:11 AM
Mihaela & Cristian Mihaela & Cristian is offline
Junior Member
 
Join Date: Mar 2006
Posts: 8
Default

We just closed yesterday (PDI on Wed), and we visited the site once every weekend in the last 4 to 6 weeks. I remember there was no drywall until 10 days to 2-weeks before our PDI. So yes, I think it can be done.

Cristian
Reply With Quote
  #3  
Old 2007-02-09, 12:08 PM
MiltonBound2006 MiltonBound2006 is offline
Senior Member
Regular User
 
Join Date: Mar 2006
Location: We are now living in MILTON!
Posts: 151
Default

Thanks for the reassurance Cristian....my lawyer and bank are calling and wanting to finalize everything....and we have no interior yet!!! This process is not good for my nerves!

How did your pdi and closing go? I hope everything turned out perfect in your house.
__________________



Reply With Quote
  #4  
Old 2007-02-09, 12:50 PM
MIKEANDELIZABETH2 MIKEANDELIZABETH2 is offline
Member
Regular User
 
Join Date: Mar 2006
Posts: 50
Default

Quote:
Originally Posted by Mihaela & Cristian
We just closed yesterday (PDI on Wed), and we visited the site once every weekend in the last 4 to 6 weeks. I remember there was no drywall until 10 days to 2-weeks before our PDI. So yes, I think it can be done.

Cristian
Hi guys,

Just curious was there many mistakes?
Reply With Quote
  #5  
Old 2007-02-09, 02:30 PM
Mihaela & Cristian Mihaela & Cristian is offline
Junior Member
 
Join Date: Mar 2006
Posts: 8
Default PDI and closing

The PDI on Wednesday went well. As others mentioned here, Tely from Sundial was very helpful. He inspected the house before we arrived and noted several items on the PDI form. Our house inspection took about 3 hours. Overall we are very happy with the (almost) finished product and all of our upgrades look good. Just one big item was missing - the glass shower - we hope to get it in next week. Also, the carpet on the second floor will be replaced, as it's not level and it was damaged during installation. There were some drywall repairs and touch-up paint to be done; along with the stair resanding and staining (these were completed before the closing on Thursday).
We also took a quick tour outside the house (it was freezing outside), and we noticed a couple of aluminium sidings being damaged on one side, and several other minor items. Sundial will complete some of the exterior work in the spring.
One final note, about the backyard - there is a lot of construction debris, some pushed by the wind against one of our basement windows; I'll try to clean some of the debris once the weather gets a little warmer.

We'll be moving in the next couple of weeks and we're looking forward to meeting our new neighbours!

Cristian
Reply With Quote
Reply

Bookmarks

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump

Similar Threads
Thread Thread Starter Forum Replies Last Post
Hiring an inspector for PDI or 30 days? mato0107 Ottawa 1 2007-11-27 01:11 PM
24H and 30 days inspection in one visit? poordionis Ottawa 3 2007-11-24 01:06 AM
Design Centre hours and days of open house OakriverB Ottawa 19 2007-02-05 08:07 AM
30 days Nicola Stouffville - Mattamy On Main and Wheler’S Mill 1 2007-01-24 06:51 PM



All times are GMT -4. The time now is 02:38 PM.



Copyright © PHAND Corporation
This document may not be used elsewhere without the expressed written consent of PHAND Corporation.
*** There is no association between this website and any builder. ***

Powered by vBulletin® Version 3.8.10
Copyright ©2000 - 2019, vBulletin Solutions, Inc.