Building and Construction General topics of building a home and the home construction industry. |
![]() |
|
Thread Tools | Display Modes |
#1
|
|||
|
|||
![]() I recently bought a home with an unfinished basement. Right now I want to complete it by myself, but there are some problems that I can't seem to find solutions for on the internet or in the book that I bought. First, I have a lot of pipes on the ceiling. One runs from one end of the basement to the other. The problem with this is the it is blocking the spot where I want to put up my studs. The only way that I can think of to put up the studs is to box the pipe, and attach the studs to the box. Is that recommended? Also, when I put up studs parallel with the floor joists, here is no joist near my wall. Does that mean I attach it directly to the floor itself? If this is the case, that's really going to suck because my ducts are there so it's going to be really hard for me. I have been reading books, but all the books are made for ideal conditions, and the internet isn't helping much either. When I get home, I will take a couple of pics and upload them. Thanks, Johnathan |
#2
|
||||
|
||||
![]()
Somewhat confusing what you wrote.
This pipe, is it an actual metal pipe for water/gas or is it a duct run? And your studs will go to a header and a footer. The header will secure to the underside of joists above in one fashion or another, and not to the underside of the floor above.
__________________
-- We do everything for Audio - Video - Data - Security For Your Home - For Your Condo - For Your Office http://www.phand.ca/ |
#3
|
|||
|
|||
![]() Quote:
__________________
Mark |
#4
|
|||
|
|||
![]()
Hey guys,
Sorry to take so long, but I managed to get some pictures of what I am talking about. My explanations aren't always the greatest, so hopefully this will help. In image 258, as you can see, there is a relatively large gap between the last floor joist and the cement wall. There is nothing for me to mount the top of my stud to, so does that mean that I have to use a bracket? Does this bracket have to be mounted into the last floor joist AND the cement wall? I hate drilling through cement, but if it has to be done, I guess I have no other choice. In image 259, this is the same area as above. As you can see in the corner, I have a bunch of pipes. How do I stud around this? Do these pipes have to be moved? If so, I think this is where I stop try to do the basement and get someone professional to handle it. I think the copper pipe that goes out side is a little too low, so it’s going to get in the way of my studing. I thought about building a box around it, but I don’t want to block off the valve. Finally, in image 263, I have those huge ducts that are connected to the walls. Do I just box around them? It seems simple enough, but that side as the same problem as above, the floor joists end like one foot away from the wall. Also, the vent that goes upwards is pressed up right against the cement wall which makes it even harder. Thanks for all the help guys. |
#5
|
|||
|
|||
![]()
you can run a metal channel along the wall , channel will be screwed with your celieng joists facing down. it will be ok if you can screw one length of channel every 20 - 24 inches .
Then your studs will directly go into the channel and scure them there. hope will help you |
#6
|
|||
|
|||
![]()
We are looking to finish our basement over the Xmas holidays. Can anyone recommend a place in the GTA that would offer delivery of drywall into your basement?
thanks! |
#7
|
||||
|
||||
![]()
Good luck with that! I know HomeDepot and Rona will usually drop it in your garage and that's it! Something about liability or something! At least thats what I was told! Good luck!
__________________
Mill Pond Victoria Elevation B [url=http://www.TickerFactory.com/] ![]() |
#8
|
|||
|
|||
![]() Quote:
http://www.rentason.ca/
__________________
Mark |
#9
|
|||
|
|||
![]() Quote:
|
#10
|
|||
|
|||
![]()
Before you complete the ceiling..
-Does your furnace or water heater use ABS plastic venting? (prior to 2007 aug it will be) - is your ceiling going to be 100% drywall? IF yes 2 both take the time now to get those switch to 636pvc venting.. by gas code your not obligated to do this.. but if and when it comes time to change either your furnace or water heater at that time you will have to change the venting to the approved 636 system... if you dont upgrade the pipes now it could mean ripping down your ceiling or parts of it to allow the changing of the pipes down the road. Small up front expense now before the drywall is up.. I offer this advise only to save headaches later... at least once a week i have to give this bad news when it comes time to change out a water heater with a finished basement.. |
![]() |
Bookmarks |
Thread Tools | |
Display Modes | |
|
|
![]() |
||||
Thread | Thread Starter | Forum | Replies | Last Post |
Finishing my basement | M&H | Ottawa | 35 | 2009-09-23 12:41 PM |
Finishing basement | whalethewise | Home Owner Tips, Upgrades and Maintenance | 7 | 2009-07-03 06:19 PM |
Finishing your basement? Some things to consider. | GregS | Milton | 0 | 2009-01-01 05:39 PM |